Skip to content
50,000+ materials with valid environmental data50,000+ building materials with valid environmental data

Connect your AI to any building material.

Carbon footprint by module, EPD validity and the EPD itself, in one question to Claude, ChatGPT or Gemini.

Works in the AI you already use

  • Claude
  • ChatGPT
  • Gemini
  • Mistral
  • Cursor

An afternoon of PDFs

tabs open: 810
  • Manufacturer A · sustainability pagesite
  • EPD_ready-mix_C25-30.pdf · 24 pagespdf
  • Manufacturer B · downloadssite
  • EPD_concrete_2019.pdfexpired
  • Manufacturer C · product pageno EPD
  • Which table is GWP A1–A3?page 9
  • Per m³ or per tonne?unit
  • EPD_C25-30_rev2.pdf · is this the current one?check
  • Email to supplier: do you have an EPD?waiting
  • gwp-comparison.xlsxsheet

Still copying GWP values into a spreadsheet

instead of

One question to your AI

QuarryQuarry connected

Compare GWP A1–A3 for three C25/30 concretes with a valid EPD, and fetch the EPDs.

Quarry7 calls · done

C25/30 concreteGWP A1–A3 · kg CO₂e / m³EPD
Beton C25/30 F3 GK16K+B Kies und Beton · DE
241.0
EPD-Kiwa-EE-199706-DEvalid until
EcoPactCO R5% C25/30Holcim Aggregati Calcestruzzi · IT
269.0
EPDITALY1128valid until
C25/30 S4 D32 CAM 5%UNICAL · IT
209.59
CAL 008/24valid until

All three have a valid EPD. The UNICAL mix is lowest at 209.59 kg CO₂e per m³, 22% below the highest. The three EPD documents are attached.

  • EPD-Kiwa-EE-199706-DE
  • EPDITALY1128
  • CAL 008/24

Real figures from the Quarry catalogue, read on 16 Nov 2026. The list of PDFs is an illustration.The left side is an illustration.

Quarry in numbers

50,000+building materials with valid environmental data
A1 to Dcarbon footprint by life-cycle module
0guesses. No EPD, no number.

What you get

Ask about a material, get three things back

The footprint, the EPD validity and the EPD itself. No more digging through PDFs.

The footprint

The carbon footprint, by module

GWP from A1–A3 through to D, per declared unit, exactly as the EPD prints it. No hunting for the right table.

Ask

What is the GWP of this C25/30 mix, module by module?

C25/30 concrete · UNICAL · per 1 m³GWP-total · kg CO₂e
ModuleStageShare of A1–A3GWP
A1–A3Production209.59
A4Transport to site2.82
C1Demolition9.64
C2Transport to waste7.14
C3Waste processing0.76
C4Disposal0.01
DBeyond the system−3.71
Source: EPD CAL 008/24
The validity

Know the EPD is still valid

EPDs usually run for five years, and nobody tells you when one lapses. Quarry checks the date on every answer and warns you when it is close.

Ask

Are the EPDs for these four products still valid?

Validity, checked on every answer
  • EPD-Kiwa-EE-199706-DEK+B Kies und Betonuntil
  • CAL 008/24UNICALuntil
  • EPD-22/0004Wienerberger · Porotherm bricksuntil
  • EPD-21/0002URSA Slovenija · 62 Ph/Vrexpires in 13 days
The document

The EPD itself, ready to cite

Every figure comes with its EPD: the document, number, owner, declared unit and validity. No EPD? Quarry says so instead of guessing.

Ask

Fetch the EPD behind that figure.

Here is the EPD behind the 209.59 kg CO₂e per m³ figure.

Dichiarazione ambientale di prodottoEPD CAL 008/24 · UNICAL S.p.A.
EPD number
CAL 008/24
Owner
UNICAL S.p.A.
Declared unit
1 m³ of concrete
Valid
to
Same EPD also covers
9 other mixes
Connect Quarry to my AI 14-day money-back guarantee

Who it's for

What would you ask about your materials?

Pick your role to see what you could ask.

LCA consultant · sustainability engineer

Ask for the inputs instead of collecting them.

Half of every assessment goes on collecting inputs, one PDF at a time. Ask once and get them in one table.

What you get

  • GWP and other indicators by module, A1 to D, per declared unit
  • EPD number, validity, and whether it is product-specific or an average
  • The EPD document, when you want to check the table yourself

Give me GWP A1–A3 for three C25/30 concretes with a valid EPD.

Three C25/30 mixes, each with a valid EPD. Figures are per 1 m³.

Product · EPD no.kg CO₂e EPD no.
UNICAL · C25/30 CAM 5%209.59CAL 008/24
K+B · Beton C25/30 F3 GK16241.0EPD-Kiwa-EE-199706-DE
Holcim IT · EcoPactCO C25/30269.0EPDITALY1128

Real catalogue figures. All three EPDs are valid until 2029 or later.

Building your own tool? The same data is available over REST and MCP. It is included in the plan

Black Friday

60% off the yearly plan

One plan, everything included. The discount is for yearly billing and ends with the timer.

--days
--hours
--minutes
--seconds

Everything in Solo

  • Ask about 50,000+ building materials
  • Carbon footprint (GWP) by life-cycle module, A1 to D
  • A validity check on every EPD
  • The EPD document behind each figure
  • Works in Claude, ChatGPT, Gemini and other MCP clients
  • REST API for your own tools
  • Read-only: Quarry cannot change anything on your side
Solo · Yearly
−60% Black Friday
59,95
23,98
EUR / month
  • Billed 287,76 EUR for 12 months instead of 719,40 EUR.
  • You save 431,64 EUR
Claim 60% off
14-day money-back guarantee
Solo · Monthly
59,95
EUR / month
  • Billed monthly. The Black Friday discount does not apply to this plan.
Start monthly
Cancel any time

What happens after you click

  1. 1

    Create your account.Two minutes, with your work email.

  2. 2

    Connect your AI.Add Quarry as a connector and sign in once. No key to copy.

  3. 3

    Ask about your first material.Start with a product you are specifying this week.

Questions before you start

Any of the 50,000+ building materials in the catalogue, from concrete to insulation: the footprint by module, EPD validity and the EPD itself. If a product is missing, Quarry says so.

From the blog

Guides on EPDs, carbon data and asking your AI for both.

All posts
ai for architects

AI for architects: asking about materials and getting a cited source

How AI for architects handles material questions: why a connected assistant can cite the EPD behind a carbon figure, and what you still check yourself.

7 min read

embodied carbon

Embodied carbon explained: what it is and how it is calculated

Embodied carbon is the greenhouse gas emitted to make, install, maintain and dispose of building materials. How it is defined, calculated and sourced.

6 min read

en 15804

EN 15804+A2 and EN 15978 explained for people who use EPDs

What EN 15804 requires of an EPD, what changed from +A1 to +A2, why the two are not comparable, and how EN 15978 uses EPD data in a building LCA.

7 min read

Which material will you ask about first?

Lock in 60% off the yearly plan before the timer runs out.

Claim 60% offends in --d --h --m --s · 14-day money-back guarantee